<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=643277470570601&amp;ev=PageView&amp;noscript=1">
Skip to content
Toured Conversions

Total Scheduled Prospects

Definition
Total Tour Schedules refers to the total number of tour bookings made during the selected time range, regardless of when the lead was created. Note:
• This is an activity-based metric, meaning it only considers when the tour was scheduled — it doesn’t matter when the lead was created.
• If a prospect schedules multiple tours within the selected time range, each of those tours will be counted individually.
Calculation
Let’s say in January at a property:
• 50 leads scheduled their tour using the Hyly.AI scheduler
• 30 leads walked in for a tour
• 20 tours were scheduled by leads or agents using a scheduler form Therefore, Total Tour Schedules for January = 50 + 30 + 20 = 100
Example
Let’s say in January at a property:
• 50 people scheduled a tour during the month. Total Tour Schedules = 50